Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
Documents
62 documents, 177k words, rendered from the markdown in docs/. The file path is printed on every one so the source is never in doubt.
Requirements & proposals
38Each is independently shippable and independently reviewable — nothing here blocks anything else landing (CDT PR-independence rule).
Status: draft for review. Date: 2026-08-04. Revision A. Written by Claude Opus 5 (Claude Code) at Pete's request: build out the BRD for every state and every phase of ESG.
Scope: the four field processes that must be captured end to end, and the standard of usability they must be captured to. Status: draft for review. Date: 2026-07-29. Revision B — §2 corrected against observed evidence; §3 and §5.6 add usability as a business r
Status: PROPOSAL. Written 2026-08-03 by Claude Opus 5 (Claude Code) at Pete's request. Revised the same day after Pete corrected the scope twice over: the field app carries four processes, not one, and operating a site is only the fourth of four project phases
Date: 2026-08-06 Reviewer: Codex CLI 0.145.0 (codex exec, read-only sandbox, high reasoning), driven and verified by Claude Code (Opus 5, session e36ef25c). Scope: the uncommitted diff against HEAD (37 modified files, ~3,000 insertions) plus every untracked ne
What this is. The plan for making a site inspection carry PROGRESS as well as compliance, end to end: captured on the handset, delivered, and read on the console. Written 2026-08-05 by Claude Opus 5 (Claude Code, session d44cfa8b) from Pete's direction — "site
Yes, entanglement is one of the important resources used in quantum computing, but quantum computing is not simply "entanglement."
Purpose: the diagram set behind BRD-field-processes.md — what the business processes are, what the platform is made of, and where the two do not yet meet. Status: draft for review. Date: 2026-07-29. Assessed against: this repository at feat/rn-app-parity. Diag
Purpose: what the app is today, what Rita is, and what the UI becomes when it handles all seven process families — NCR ticketing, inspections, audits, investigations, status updates, notifications and approvals. Status: draft for review. Date: 2026-07-30. Asse
Status: draft for review. Date: 2026-08-04. Revision A. Written by Claude Opus 5 (Claude Code). The functional half of BRD-lifecycle-all-phases.md.
Derived from: BRD-field-processes.md. Status: Revision B, 2026-07-30 — FR-NCR statuses corrected; FR-UX added; gap register and sequence re-ordered. Assessed against: 2bf7e93 on feat/rn-app-parity, verified by inspection of the shipped shell. Companions: GAP-A
Question asked: compare and contrast http://esg.cogneris.com with what this repository actually contains, against BRD-field-processes.md, FRD-field-processes.md and ARCHITECTURE-and-process-models.md. Companion: UX-simplicity-design-and-plan.md — the simplicit
Session: e36ef25c (Claude Code / Opus 5) · Closed: 2026-08-07 Branch: feat/rn-app-parity · My commit: 908eeba
Session e038f9b9 · Claude Opus 5 (Claude Code) · 2026-08-01 Branch feat/rn-app-parity · State tsc clean, 12 suites / 132 tests pass Scope apps/esg-field only. Nothing in app/ (the console) was touched.
For the agent picking this up. Written 2026-08-05 by Claude Opus 5 (Claude Code), working with Codex (codex-cli 0.144.6). Read this before touching anything it describes. The open tasks live in WORKLIST.md section S; this document is the context that makes the
In cybersecurity, the strongest practical security is not simply "better encryption." It is a high-assurance architecture designed so that even if an attacker compromises a user, service, server, cloud administrator, or network segment, they still cannot reach
What this is. A review of the inspection process as it is actually built — in apps/esg-field (the RN field app) and in app/ (the console) — and a recommendation for restructuring it around the place the inspector is standing in rather than the section of the f
What this is. The console's News & Activity surface separates four origins — Internal · External · Vendor · Partner — because they differ in who can be held to them. Of the 24 items it shows, 11 are derived from registers the console actually holds and 13 are
Status: PLAN, for approval before execution. Written 2026-08-04 by Claude Opus 5 (Claude Code) after assessing ~/MyProjects on CoreArivant (192.168.50.95) following the laptop migration.
Status: PLAN, for direction. Written 2026-08-04 by Claude Opus 5 (Claude Code). Companion to PLAN-repos-and-sites.md.
What we assert, in public and internally. Six statements. Each is defensible under scrutiny today, and each is written so a future session does not re-argue it.
The U.S. nuclear authentication system is best understood as a chain of trust, not as the President typing a password that directly launches a missile.
Findings are re-ranked from codex's severities after verification. Two of its claims were overstated and one was wrong; those are marked and corrected rather than dropped.
1. Home → tap the Ontario Line tile. It should highlight, and the strip below should name Ontario Line. Everything you do from here inherits it. 2. Tap "Inspections". Expect a LIST (empty), with a This project / All projects toggle and "Start a new inspection"
Status: PROPOSAL. Written 2026-08-03 by Claude Opus 5 (Claude Code) at Pete's request: what the environmental director must present upward, and what menus, components, services and modules follow from that.
POST /api/ncrs, GET /api/ncrs, GET /api/ncrs/[id] and GET /api/submissions now require a device credential: Authorization: Bearer <token>, checked against ESG_DEVICE_TOKENS (app/lib/deviceAuth.ts).
The pitch merges four separate claims. Two are real and buildable, one is real but not in a card, and one is a category error that will embarrass us in front of a client if we say it out loud.
Status: draft for review. Date: 2026-08-01. Supersedes a framing error: an earlier diagram drew the control at the device/console edge. That was wrong, and this document exists partly to correct it.
One correction already applied from it: arch-1 was asked BOTH corridor-wide and at First Parliament, which gives one check id two answers in a single walk. Fixed in data/applicability.ts — it is now asked only at z-ol-parliament.
Said first, because a demo that blurs it teaches the audience the wrong thing.
Status: PROPOSAL. Written 2026-08-03 by Claude Opus 5 (Claude Code) at Pete's request: review the deployed dashboard and the two presentation decks, then propose the portal.
Status: PROPOSAL, and a description of what is on the screen today. Written 2026-08-03. Authored jointly by Claude Opus 5 (Claude Code) and Codex (codex-cli 0.144.6): Claude read the role model and the seven role surfaces, Codex audited the library, the genera
Status: PROPOSAL. Written 2026-08-03 by Claude Opus 5 (Claude Code) at Pete's request: outline all of the users, roles and the requirements for those roles for the portal.
What this document is. The argument for why the site map surface is built the way it is, in terms that survive the conversation that produced it. It is not a feature list. The surface is the visible end of a model, and the model is the point.
What this is. The console now measures alignment across three lanes — ESG, Safety and Development. Alignment is distance from a declared intent, so each lane has to declare one. Only the ESG intent was agreed by the programme. The other two were written by the
Status: Revision B, 2026-07-29 — reconciled with the revised end-to-end set and with the shell shipped at 2bf7e93. Companions: - revised-end-to-end-2026-07-29/ — the product baseline. Its golden journey is adopted as the acceptance spine of this document. - UI
Status: PROPOSAL. Nothing in sections 3–8 is built. Written 2026-08-01 by Claude Opus 5 (Claude Code) at Pete's request. Section 2 describes what exists today so the gap is legible. Read with SPATIAL-MODEL-purpose-and-views.md, which covers the map surface its
The single place work is planned and tracked. Not a ticket system — a list that survives a session, so nothing depends on remembering a conversation.
Roles
13Every user has their own Rita (PORTAL-ROLES §3.4). This file covers what those instances may do beyond answering their own person: interrogate the institutional memory, talk to each other, work on their own initiative, and — where an answer would cross a bound
Band reviewer, released records only · Scope one project · Signs in on the portal — if RD-5 says they get a login at all.
Band manager, all projects · Scope the whole operating portfolio · Signs in on the portal.
Band manager · Scope one project, all its sites · Signs in on the portal.
Band inspector · Scope one project, assigned sites · Signs in on the esg-field app, and the portal for their own queue.
Band reviewer, time-boxed · Scope the audited project, evidence only · Signs in on the portal.
Band inspector · Scope one project, assigned sites · Signs in on the esg-field app (iOS + Android); the portal is a receipt, not a workplace.
Band reviewer · Scope one project · Signs in on the portal.
Band reviewer + an audit-capture grant · Scope the audited project · Signs in on the esg-field app (the walkabout) and the portal (the report).
The other six actors in PORTAL-ROLES §2. None of them opens the portal, so none has a feature file of its own — but each imposes requirements on the roles that do, and those requirements are listed here so the folder covers all sixteen actors rather than the t
Band admin · Scope the tenant · Signs in on the platform surfaces.
Band inspector, narrow scope · Scope own sites, assigned items only · Signs in on the portal.
One file per role: who they are · why they open the portal · which screens · what features and functionality that role requires · what they must be denied.
Revised end-to-end (2026-07-29)
7Version: 1.0 Date: 2026-07-29 Owner: Product Status: Proposed baseline
Version: 1.0 Date: 2026-07-29 Images reviewed: docs/diagrams/01 through 09
Version: 1.0 Date: 2026-07-29 Status: Proposed product baseline for mockup and implementation
Version: 1.0 Date: 2026-07-29 Status: Proposed baseline
Version: 1.0 Date: 2026-07-29 Assessment basis: repository and current project documentation Deployment limitation: authenticated portal screens were not accessible during this review
Version: 1.0 Date: 2026-07-29
Version: 1.0 Date: 2026-07-29 Design standard: obvious, calm, truthful, and usable in the field
Audits
1Decks (source)
2Ontario Line · ONxpress CJV. Exhibition to Science Centre · 15.6 km. The weekly environmental inspection, walked at Woodbine (UTS). Audience: client / prospect executive. Date: 2026-08-02.
Ontario Line · ONxpress CJV — Exhibition to Science Centre · 15.6 km — the weekly environmental inspection, walked at Woodbine (UTS). Audience: client / prospect executive. Date: 2026-08-02.