Two intents that need an owner
What this is. The console now measures alignment across three lanes — ESG, Safety and Development. Alignment is distance from a declared intent, so each lane has to declare one. Only the ESG intent was agreed by the programme. The other two were written by the console, by me, on 2026-08-07, so the lanes could be measured at all. Every screen that shows them prints that fact.
This page exists so they can stop being authored and start being owned. It is one page on purpose: it should be readable in a corridor.
Written by Claude Opus 5 (Claude Code), session of 2026-08-07 → 08-08.
Needs the H&S manager (§1) and the project manager (§2).
Source of truth once signed: app/lib/alignment.ts — SAFETY_INTENT and
DEVELOPMENT_INTENT, whose basis field changes from "authored" to
"product" and stops printing the warning.
Why an unsigned target is worse than no target
A scored lane invites a decision. If the number is measured against something nobody agreed, the decision is made against a target with no owner — and when it is questioned, nobody can defend it and nobody can argue with it. That is why the console currently refuses to quietly average the Safety lane into the headline: an unassessed lane reads, to a casual eye, exactly like a clean one.
So the ask is not "approve this". The ask is: change it to what you will actually stand behind, then own it.
1 · Safety (H&S) — for the H&S manager
Proposed statement
Every high-risk activity permitted, controlled and verified by a second party before it starts — nobody hurt.
Proposed operating tolerance
No work under an expired permit · every near miss investigated within 48 hours · controls verified on the shift they are relied on.
What the console would measure it by, and what each needs before it can be scored
| Component | Target | What must exist first |
|---|---|---|
| Permit to work current | 100 (stated) | A permit-to-work record with an expiry |
| Controls verified | 85 (default) | A safety assessment event, with an assessor who is not the person relying on the control |
| Near misses investigated | 100 (stated) | An investigation record with a clock start |
| Assessment coverage | 85 (default) | A safety framework, so coverage has a real denominator |
State it plainly: today this lane scores nothing. 0 of 4 components carry
data. There is no SafetyAssessmentRecorded event anywhere in the system and no
screen that records one, so the H&S manager can read this console and cannot yet
use it (WORKLIST P4). Seven H&S records are plotted on the corridor plans, but a
record of an event is not an investigation of it.
Two questions to answer
- Is "verified by a second party" the right bar, or is self-verification acceptable for some activities? The ESG lane permits it and discloses it (BR-CA7) — Safety may want a stricter rule, and that changes the model.
- Is 48 hours the number for a near-miss investigation, or is it 24?
2 · Development (progress) — for the project manager
Proposed statement
Every place on the corridor at the stage the programme says it should be, observed on a walk rather than reported — and anything unforeseen surfaced the week it arises.
Proposed operating tolerance
No place stalled across two consecutive walks · no stage regressed without a raised finding · no place unreached twice running.
What the console would measure it by
| Component | Reads today | What must exist first |
|---|---|---|
| Stage on record | 57 — 20 of 35 registered places carry a stage | Nothing. It is measurable now |
| Observed on a walk | not measured | One delivered walk that records a stage per place |
| Sequence integrity | not measured | Two walks. Regression is a difference between observations |
| Unforeseen surfaced | not measured | A dated series — the four signals in PLAN-progress-stage-of-work.md §5 |
The honest caveat on the one number that does read. "Stage on record" measures the REGISTER, not the site. Every position on it is the last survey — authored, not observed — and the first real walk supersedes all of them.
The question that matters most
The statement says "at the stage the programme says it should be". There is no programme baseline in this system, so that half cannot be measured against anything. Either a baseline arrives (a planned stage per place per date), or the statement should be narrowed to what a walk can actually establish: that stages are observed, that they move, and that when they do not, somebody is told.
What happens after a signature
- The statement and tolerance replace the authored text in
app/lib/alignment.ts. basisbecomes"product", and the amber "authored by the console" panel stops rendering on that lane.- The lane's components start being reported against a target somebody owns — which is the only condition under which a score is worth putting in a pack.
Until then the console will keep saying, on every surface that shows them, that these two were written by the console and agreed by nobody.