Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
Environmental compliance, captured where it happens and governed where it matters
One record: what we are required to do, what was found on site, who decided what about it, and what the evidence actually supports. This is the index to that system — the industry it serves, the platform, the requirements, the roles, and every document, diagram and demo in the repository.
The industry
the problemA transit corridor, a station box, a brownfield site by a river. The environmental obligations are real, dated and enforceable — permits, approvals, monitoring programmes, species windows, commitments made in a bid. Compliance is not the hard part. Evidencing it years later is.
Who asks the questions
The client, contractually. The regulator, event-driven. The certification body, on schedule. The board, quarterly. Four audiences, four cadences — all asking about the same underlying record.
Why paper systems fail
A photo with no time, place or author. A section marked compliant because nobody recorded a finding against it. A ticket closed by the person who did the work. None of these is fraud; all of them are indefensible.
What the site is actually like
Gloves, daylight, no signal, a two-kilometre walk. Any tool that assumes connectivity, typing or training has already failed.
Coverage is not conformity
That a section was reached and inspected is a claim about the inspector. That it was compliant is a claim about the site. Systems that merge the two produce confident numbers that fall apart under audit.
The commercial edge
An obligation identified when pricing work becomes a budget line, a permit application, an inspection item, then a non-conformance. A company that keeps that chain can answer “you bid this on the basis of X — did you do X?”
Scope, stated plainly
The Eof ESG — environmental compliance on operating sites. Not sustainability disclosure, not social value, not carbon accounting. Governance and Health & Safety are separate platform modules and are inactive.
Four processes, one closure mechanism
green built · amber not to its rule · red absentThey unify at the closure end and never at the record end — a non-conformance found by any of them is closed as an NCR, but an inspection verdict and an audit grade are different vocabularies with different consequences.
NCR ticketing
A single non-conformance driven to verified closure. A record in its own right — raised, assigned, corrected, verified, closed — not a row inside a walk.
Lifecycle implemented. The raise crosses to the console; everything after it is device-only.
Site inspection
A section-by-section walk against a governing checklist, producing the client’s pinned report format, with multi-party signature.
Capture and on-device report built. The inspection log does not reach the console.
Audit
Conducted against a standard or scope, graded major / minor / observation / OFI. Majors and minors must raise tickets; observations must not.
Absent from the product. The largest single gap in scope.
Incident → investigation
Three chained records. When it happened is not when it was reported. A notifiable incident starts a clock somebody owns.
Event vocabulary contracted; both ends of the process missing.
The platform
the deck’s fourField app — capture
React Native, iOS and Android. Voice, photo, GPS and chainage bound at capture to time, author and place. Fully operable offline; the report renders on the device.
Built and running. No identity yet — every actor is recorded as “device”.
Portal — governed execution
Review · decide · authorize · assign · escalate · verify · learn. Not a dashboard-only product: it is where field evidence becomes governed execution.
All seven verbs are writes. The console writes on ingest and never on governance.
Personal agent — Rita
One instance per person, inheriting that person’s scope and none of their authority. Drafts, summarises, proposes — never signs, closes or releases.
On-device answers are briefed or composed locally, each with provenance. No model key, no network call. Collaboration between agents is specified, not built.
Institutional memory
Intent → observation → evidence → decision → reason → outcome, with recurrence. Reading it backwards is tracing a decision’s history.
A scope-verified retrieval tier exists; the corpus behind it does not.
The rule that shapes the architecture. No model sits in the certified compliance path. Machine-generated content is a labelled draft a person accepts; it may not mark coverage, sign, submit, close a ticket, or supply a value no person or sensor produced. Enforced in CI, not merely intended.
Requirements
BR states what must be true · FR states what must be built| Family | Covers | State |
|---|---|---|
| BR-CA · FR-NCR | NCR lifecycle — owner and due date, no closure without recorded and verified work, retraction without asserting a correction that never happened, self-verification disclosed rather than prohibited | built |
| BR-S · FR-INS | The inspection walk — coverage separate from conformity, attestation method stated, not-reached recorded with a reason, the pinned client report format | partial |
| BR-AU · FR-AUD | Audit — standard and scope, internal vs external and the auditor's organisation, four grades, majors and minors raise tickets, observations must not | absent |
| BR-I · FR-INC/INV/RPT | Incident, investigation, report — occurred-at never conflated with reported-at, notification deadlines owned, root-cause method stated, revisions supersede without overwriting | absent |
| BR-X · FR-X | Cross-cutting — offline always, append-only, evidence bound at capture, unavailable inputs reported as unavailable, never “delivered” unless delivery was observed | mostly |
| BR-U · FR-UX | Usability as a business requirement — one capture action, five plain delivery states, drafts labelled and editable, and where a shortcut and an honest record conflict the record wins | partial |
| FR-SEC | Security — closed role set, no model in the proof chain, capture timestamps never fabricated, identifiers from the platform CSPRNG or the operation fails | reads only |
| FR-ROLE | Roles and authority — a person not a device, band × scope × grants, write-plane enforcement, decisions as appended events, per-person agents and sponsored disclosure | specified |
Full text: business requirements · functional requirements · roles & authority
Roles and agents
16 actors, 10 of them sign inAuthority is band × scope × grants, over a closed set of four bands. admin is not the top of a ladder — it is a different ladder, carrying platform authority and no compliance signature. The most privileged compliance role is manager.
| Role | Band | What the portal is for | Brief |
|---|---|---|---|
| Field inspector | inspector | A receipt, not a workplace — did it arrive, what came back, what do I owe | read → |
| Environmental monitor | inspector | Assigned work, monitoring due dates, corrections recorded with real dates | read → |
| Site supervisor | inspector | A queue, not a console — what is owed, by when, and what proof is accepted | read → |
| HSE lead | reviewer | Triage, assignment within their site, proposing decisions to the manager | read → |
| Environmental manager | manager | The decision queue — the seven governance verbs on one project | read → |
| Environmental director | manager · all projects | Exposure across the portfolio, escalation, and external release | read → |
| Internal auditor | reviewer +grant | Audit against a standard; raises tickets and never closes them | read → |
| External auditor | reviewer · time-boxed | Evidence sampling inside a declared engagement window | read → |
| Client representative | reviewer · released only | Released records and a query — never a draft, never a ticket | read → |
| Platform administrator | admin | Identities, devices, integrity — and no compliance signature at all | read → |
| Parties & non-human actors | no login | Site representative · crew · regulator · board · the device · Rita | read → |
Every person has their own agent
Rita is not one system agent everyone queries. Each instance inherits its principal’s scope and none of their grants, and its memory is per-identity — one person’s exchanges never surface in another’s.
Agents collaborate, and ask before they disclose
An agent may interrogate the memory, ask a colleague’s agent, and work unbidden. An agent-to-agent answer may contain only what the requesting principal could have read themselves — anything more is a disclosure their human sponsor approves. Silence is refusal. The protocol →
What is real
so nothing reads as nearer than it isGenuinely built
The NCR lifecycle and its derivations. Offline capture with evidence bound at capture. The on-device report. Two-party signature. Append-only storage enforced at the engine. Scope-verified retrieval. A CI guard keeping models out of the proof chain.
Exists, but not to its rule
The console’s registers derive correctly from illustrative data rather than a live store. Inspection capture completes on the device but the log does not reach the console. Rita answers, but only from what is on the device.
Absent
Identity — every actor is recorded as “device”. Every governance write. Audits entirely. Both ends of the investigation process. Agent collaboration and sponsored disclosure. Role enforcement on the write plane.
The cheapest credible step. The work queue already draws five governance actions with the right verbs on the right rows — assign an owner and a due date, verify the re-inspection and sign to close. They are fully styled buttons with nothing behind them. Making those five real requires identity, an approval vocabulary and somewhere to write, and nothing else.