Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
What it's costing — already
The tagged-out excavator is the live cost: idle plant plus the re-inspection turnaround, and it can't return to work until the tag clears. The stormwater and spill items carry regulatory exposure — a TRCA permit condition and an MECP spill-response obligation — that compounds the longer they sit.
None of this was agreed to. It's the standing cost of the open items, visible now rather than in an August audit.
Exposure carried right now
Cost is stated as exposure carried, not as a dollar figure. There is no rate card, no delay model and no claim history in this system, so a currency number here would be invented — and an invented cost is the fastest way to lose a room.
What is actually late
Obligation register
The narration is the briefed script; every figure beside it is derived live from the 7 tickets in the register. Where the two would disagree the register wins. Dates measure against 2026-07-18, a prerender anchor rather than a clock.