Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
What moved
New issues are falling and closures are keeping pace — the last two weeks opened fewer than they shut. The live movers: the EX-220 tag lapse (today), the Jul 14 rain event forcing a sediment-fence re-check, and the short spill kit at the north fuel point.
Categories are stable. Equipment tags is the one line trending the wrong way.
Are we closing faster than we are raising?
DerivedNo. Across all 10 days the backlog never once shrank — 5 days grew it and the rest held level.
Show the numbers
| Day | Raised | Closed | Net |
|---|---|---|---|
| 09/07 | 1 | 0 | +1 |
| 10/07 | 0 | 0 | 0 |
| 11/07 | 0 | 0 | 0 |
| 12/07 | 0 | 0 | 0 |
| 13/07 | 1 | 0 | +1 |
| 14/07 | 1 | 1 | 0 |
| 15/07 | 2 | 1 | +1 |
| 16/07 | 0 | 0 | 0 |
| 17/07 | 1 | 0 | +1 |
| 18/07 | 1 | 0 | +1 |
How long things have been sitting
Oldest live: NCR-2026-029 at 5 days — Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.
The narration is the briefed script; every figure beside it is derived live from the 7 tickets in the register. Where the two would disagree the register wins. Dates measure against 2026-07-18, a prerender anchor rather than a clock.