The drift is in two areas. Equipment inspection tags is an action: excavator EX-220 ran past its monthly tag and two daily walk-around logs are missing. Spill containment and the stormwater line are at-risk, not breached.
Nobody had to reconstruct this. The register carries it the day it happens.
Drift against intent
Derived
Closure50%
1 of 2 closures asserted a verified fix. The rest were retracted or superseded — real outcomes, but not corrections.
On time80%
1 of 5 live tickets are past a date somebody committed to.
Delivered86%
1 of 7 tickets are still held on a device. The console has the device's copy, not a confirmed submission.
Evidence71%
5 of 7 tickets carry both a photo and a GPS fix. Where either is missing the record says missing — nothing is inferred.
Second party100%
0 of 2 closures were verified by whoever did the work. Permitted (BR-CA7), disclosed rather than hidden, and the director's to countersign.
The marker on each track is the operating tolerance, not an average. A meter reads against what we said we would do — which is the only comparison that means anything.
The narration is the briefed script; every figure beside it is derived live from the 7 tickets in the register. Where the two would disagree the register wins. Dates measure against 2026-07-18, a prerender anchor rather than a clock.