Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
“What am I walking today, and did what I sent arrive?”
This surface: What authorises the work, and when each authority lapses.
The record says “M. Michaud”, not Sam Iyer: 0 of 0 tickets assigned to that string are open · 3 raised by them. A signature naming a role string identifies nobody.
Attest a section — whole-section or item-by-item (+2 more) · Close a ticket they raised (+1 more). Printed, not enforced: nothing in this console checks a permission.
Permit register
Every environmental permit held against the site — number, issuer, effective and expiry dates, and what it covers. The anchor every obligation traces back to. Sort by any column, filter by status, or search.
| ESDP-2025-338 | Endangered species dev. permit — habitat windowExpired Vegetation clearing outside the breeding-bird window; monitoring and mitigation reporting. Held by Env monitor · 5 conditions · effective Sep 1, 2025 | MECP · SARO | Species at risk | Woodbine — south verge | Jun 30, 202618d overdue |
| NOISE-EXM-2026-14 | Municipal noise by-law exemption — night worksExpiring Extended-hours track work during scheduled rail possessions; community notification required. Held by Site super · 3 conditions · effective Feb 1, 2026 | City of Toronto | Noise | Woodbine — track possession | Jul 20, 2026in 2d |
| WASTE-GEN-77120 | Generator registration — non-hazardous wasteExpiring Generation and off-site movement of construction & excavation waste; manifest retention. Held by Logistics lead · 5 conditions · effective Nov 1, 2024 | MECP · HWIN | Waste | Woodbine — laydown | Jul 24, 2026in 6d |
| PTTW-6633-118 | Permit To Take Water — construction dewateringExpiring Dewatering of excavations up to 400,000 L/day, with discharge monitoring to the storm system. Held by Site super · 7 conditions · effective May 15, 2025 | MECP · PTTW | Water taking | Woodbine — cut & cover | Aug 31, 2026in 44d |
| TRCA-2025-0912 | TRCA Permit — watercourse & sediment controlActive Works within the regulated area; sediment fencing, erosion control and post-rainfall inspection. Held by Env monitor · 6 conditions · effective Apr 1, 2025 | TRCA | Watercourse | Woodbine — north crossing | Sep 30, 2026 |
| ECA-8421-AKQR7 | Environmental Compliance Approval — Air & NoiseActive Crushing, screening and concrete batching; stationary plant emissions and site noise limits. Held by Env manager · 9 conditions · effective Mar 1, 2024 | MECP · EASR | Air & noise | Woodbine — main compound | Feb 28, 2027 |
| ROW-METX-4471 | Metrolinx right-of-way environmental permitActive Environmental controls for works within the rail corridor; dust, runoff and vibration limits. Held by Env manager · 8 conditions · effective Jun 15, 2024 | Metrolinx | Right of way | Woodbine — corridor | Jun 14, 2027 |
| SPILLS-EMP-004 | Spill prevention & response plan (registered)Active Fuel and hydraulic storage, spill kit manifests and reporting thresholds under O.Reg 675/98. Held by HSE lead · 4 conditions · effective Jan 10, 2025 | MECP · Spills | Spills | Woodbine — fuelling points | No expiryStanding registration |
Conditions extracted from each permit become tracked obligations. Illustrative data · ONxpress CJV · Woodbine (UTS).
The surface above is the same for every role. `?role=` states who is looking and shapes what is emphasised; it filters nothing and withholds nothing, because there is no identity service, no session and no permission check in this console. A role banner over an unfiltered page is only honest while it says so.