Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).

Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.

Marie Boucher · Environmental Manager

“Is my site defensible, and what is waiting on me to verify?”

This surface: What authorises the work, and when each authority lapses.

Band · manager
Cadence · Daily
Employee
What the record ties to this person

Nothing. The record carries no string for Marie Boucher at all, so no row on any surface can be attributed to them. That is the identity gap (S1) rather than an empty queue — and it is why this band prints the fact instead of a zero.

May sign · may not

Assign an owner and a due date (+2 more) · Approve a retraction — that is the director's (+2 more). Printed, not enforced: nothing in this console checks a permission.

Module · Permits

Permit register

Every environmental permit held against the site — number, issuer, effective and expiry dates, and what it covers. The anchor every obligation traces back to. Sort by any column, filter by status, or search.

Permits
8
Held on this site
Expired
1
Past their expiry date
Expiring
3
Lapse within 60 days
Conditions
47
Obligations traced to permits
8 of 8
ESDP-2025-338
Endangered species dev. permit — habitat windowExpired
Vegetation clearing outside the breeding-bird window; monitoring and mitigation reporting.
Held by Env monitor · 5 conditions · effective Sep 1, 2025
MECP · SAROSpecies at riskWoodbine — south verge
Jun 30, 202618d overdue
NOISE-EXM-2026-14
Municipal noise by-law exemption — night worksExpiring
Extended-hours track work during scheduled rail possessions; community notification required.
Held by Site super · 3 conditions · effective Feb 1, 2026
City of TorontoNoiseWoodbine — track possession
Jul 20, 2026in 2d
WASTE-GEN-77120
Generator registration — non-hazardous wasteExpiring
Generation and off-site movement of construction & excavation waste; manifest retention.
Held by Logistics lead · 5 conditions · effective Nov 1, 2024
MECP · HWINWasteWoodbine — laydown
Jul 24, 2026in 6d
PTTW-6633-118
Permit To Take Water — construction dewateringExpiring
Dewatering of excavations up to 400,000 L/day, with discharge monitoring to the storm system.
Held by Site super · 7 conditions · effective May 15, 2025
MECP · PTTWWater takingWoodbine — cut & cover
Aug 31, 2026in 44d
TRCA-2025-0912
TRCA Permit — watercourse & sediment controlActive
Works within the regulated area; sediment fencing, erosion control and post-rainfall inspection.
Held by Env monitor · 6 conditions · effective Apr 1, 2025
TRCAWatercourseWoodbine — north crossing
Sep 30, 2026
ECA-8421-AKQR7
Environmental Compliance Approval — Air & NoiseActive
Crushing, screening and concrete batching; stationary plant emissions and site noise limits.
Held by Env manager · 9 conditions · effective Mar 1, 2024
MECP · EASRAir & noiseWoodbine — main compound
Feb 28, 2027
ROW-METX-4471
Metrolinx right-of-way environmental permitActive
Environmental controls for works within the rail corridor; dust, runoff and vibration limits.
Held by Env manager · 8 conditions · effective Jun 15, 2024
MetrolinxRight of wayWoodbine — corridor
Jun 14, 2027
SPILLS-EMP-004
Spill prevention & response plan (registered)Active
Fuel and hydraulic storage, spill kit manifests and reporting thresholds under O.Reg 675/98.
Held by HSE lead · 4 conditions · effective Jan 10, 2025
MECP · SpillsSpillsWoodbine — fuelling points
No expiryStanding registration

Conditions extracted from each permit become tracked obligations. Illustrative data · ONxpress CJV · Woodbine (UTS).

The surface above is the same for every role. `?role=` states who is looking and shapes what is emphasised; it filters nothing and withholds nothing, because there is no identity service, no session and no permission check in this console. A role banner over an unfiltered page is only honest while it says so.