Cogneris
Environmental Compliance & Inspection

Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).

Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.

Console v2 · The Queue — What needs me — and I can act here
band: managerOne project, all its sites.

Marie Boucher

Environmental Manager · ONxpress CJV · Woodbine (UTS)

“Is my site defensible, and what is waiting on me to verify?”

← All roles
May sign
  • — Assign an owner and a due date
  • — Record that corrective work was verified effective
  • — Accept a section recorded as not reached
May not
  • — Approve a retraction — that is the director's
  • — Countersign their own verification
  • — Release a report to the client

ONxpress CJV · Woodbine (UTS)

7 of 7 tickets in the register are on this site

Everything below is scoped to this project. A manager who can see the whole portfolio spends their day reading other people's problems.

Unowned
1
no owner, no date
In correction
3
assigned or actioned
Awaiting the director
1
verified — not yours to close
Overdue
1
past the committed date

What is waiting on you — 2

Derived

Assigning an owner and recording that work was verified effective are yours. Approving a retraction and countersigning a self-verified closure are not — those are the director's, and the split is the point rather than an inconvenience.

NCR-2026-032

North fuel point spill kit short of manifest — absorbent booms absent.

The correction was verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.. The first fix did not hold.

If you act: A new corrective action is appended; the failed one stays on the record.

needs S1 identity + S2 decisions
How do you know that's true?— show the evidence
Raised byM. MichaudOn2026-07-15Photos1GPS43.7061, -79.5949Spoken notetyped, not spokenOriginWeekly inspection · Jul 15Delivered2026-07-15
The chain — appended, never edited
  1. Jul 15M. Michaud — Raised medium — North fuel point spill kit short of manifest — absorbent booms absent.
  2. Jul 15HSE lead — Assigned, due Jul 18.
  3. Jul 16HSE lead — Interim booms staged from central store; supplier reorder placed, ETA Jul 17.
  4. Jul 17M. Michaud — Verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.
Traces to: OBL-072 · MECP · Spills
NCR-2026-034

Mixed construction waste in the clean-fill bin at the south laydown.

Nobody owns this and no date is committed. Until both exist it cannot be reported as overdue against anything.

If you act: The ticket becomes measurable and lands on somebody's queue.

needs S1 identity + S2 decisions
How do you know that's true?— show the evidence
Raised byD. TremblayOn2026-07-18Photos1GPSno fix — the device had noneSpoken notetyped, not spokenOriginRaised standalone in the field appDeliveredNOT DELIVERED — device copy only
The chain — appended, never edited
  1. Jul 18D. Tremblay — Raised low — Mixed construction waste in the clean-fill bin at the south laydown.
Traces to: MECP · Reg 347

Where it concentrates

Derived
Dust & air quality1 · 1 live
Equipment inspection tags1 · 1 live
Erosion & sediment control1
Noise & vibration windows1
Spill kits & containment1 · 1 live
Waste segregation & manifests1 · 1 live
Watercourse / stormwater1 · 1 live

Coverage versus conformity

Not captured

Which sections were actually attested this period, whole-section or item-by-item, and which were simply never flagged. This is the number a manager is judged on and the one they cannot see.

Blocked on: the device records it; inspection records do not reach the console

Scoped to ONxpress CJV · Woodbine (UTS). Every count derives from the ticket register. Dates measure against 2026-07-18.