Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
“Where is my exposure, across every project and every phase?”
This surface: What authorises the work, and when each authority lapses.
Nothing. The record carries no string for Clarke Gunter at all, so no row on any surface can be attributed to them. That is the identity gap (S1) rather than an empty queue — and it is why this band prints the fact instead of a zero.
Close a verified NCR (+8 more) · Raise a finding in the field (+2 more). Printed, not enforced: nothing in this console checks a permission.
Permit register
Every environmental permit held against the site — number, issuer, effective and expiry dates, and what it covers. The anchor every obligation traces back to. Sort by any column, filter by status, or search.
| ESDP-2025-338 | Endangered species dev. permit — habitat windowExpired Vegetation clearing outside the breeding-bird window; monitoring and mitigation reporting. Held by Env monitor · 5 conditions · effective Sep 1, 2025 | MECP · SARO | Species at risk | Woodbine — south verge | Jun 30, 202618d overdue |
| NOISE-EXM-2026-14 | Municipal noise by-law exemption — night worksExpiring Extended-hours track work during scheduled rail possessions; community notification required. Held by Site super · 3 conditions · effective Feb 1, 2026 | City of Toronto | Noise | Woodbine — track possession | Jul 20, 2026in 2d |
| WASTE-GEN-77120 | Generator registration — non-hazardous wasteExpiring Generation and off-site movement of construction & excavation waste; manifest retention. Held by Logistics lead · 5 conditions · effective Nov 1, 2024 | MECP · HWIN | Waste | Woodbine — laydown | Jul 24, 2026in 6d |
| PTTW-6633-118 | Permit To Take Water — construction dewateringExpiring Dewatering of excavations up to 400,000 L/day, with discharge monitoring to the storm system. Held by Site super · 7 conditions · effective May 15, 2025 | MECP · PTTW | Water taking | Woodbine — cut & cover | Aug 31, 2026in 44d |
| TRCA-2025-0912 | TRCA Permit — watercourse & sediment controlActive Works within the regulated area; sediment fencing, erosion control and post-rainfall inspection. Held by Env monitor · 6 conditions · effective Apr 1, 2025 | TRCA | Watercourse | Woodbine — north crossing | Sep 30, 2026 |
| ECA-8421-AKQR7 | Environmental Compliance Approval — Air & NoiseActive Crushing, screening and concrete batching; stationary plant emissions and site noise limits. Held by Env manager · 9 conditions · effective Mar 1, 2024 | MECP · EASR | Air & noise | Woodbine — main compound | Feb 28, 2027 |
| ROW-METX-4471 | Metrolinx right-of-way environmental permitActive Environmental controls for works within the rail corridor; dust, runoff and vibration limits. Held by Env manager · 8 conditions · effective Jun 15, 2024 | Metrolinx | Right of way | Woodbine — corridor | Jun 14, 2027 |
| SPILLS-EMP-004 | Spill prevention & response plan (registered)Active Fuel and hydraulic storage, spill kit manifests and reporting thresholds under O.Reg 675/98. Held by HSE lead · 4 conditions · effective Jan 10, 2025 | MECP · Spills | Spills | Woodbine — fuelling points | No expiryStanding registration |
Conditions extracted from each permit become tracked obligations. Illustrative data · ONxpress CJV · Woodbine (UTS).
The surface above is the same for every role. `?role=` states who is looking and shapes what is emphasised; it filters nothing and withholds nothing, because there is no identity service, no session and no permission check in this console. A role banner over an unfiltered page is only honest while it says so.