Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
Clarke Gunter
Environmental Director · Cogneris
“Where is my exposure, across every project and every phase?”
Blocked at the claim, not the UI (RD-1). This role's defining property is holding every project. The signed session claim carries project — singular (workers/esg-query/src/authz.ts:23), and a minter using a plural form reads nothing. Widening it to projects: string[] is the single change that makes this surface expressible, and it is cheapest now while the pilot is one project.
- — Close a verified NCR
- — Approve a retraction (not-a-non-conformance)
- — Countersign a self-verified closure
- — Reassign an owner or move a due date
- — Accept an investigation conclusion
- — Sign an audit conformity conclusion
- — Release a report externally
- — Escalate a notifiable incident
- — Mobilisation sign-off — this site may be operated
- — Raise a finding in the field
- — Record the corrective work they then verify
- — Edit a sealed walk — corrections are new events
Today
DerivedA fix did not hold
NCR-2026-032 was corrected and the correction was verified NOT effective. Repeat work is the strongest early signal of a systemic cause, and it is the thing a close rate hides.
North fuel point spill kit short of manifest — absorbent booms absent.
Mean of 5 measured components. 1 component (Coverage) has no data and is excluded rather than scored zero.
Why that number is what it is
A score nobody can take apart is a score nobody can defend. Each contributor below is the sentence behind one ring above.
1 of 2 closures asserted a verified fix. The rest were retracted or superseded — real outcomes, but not corrections.
1 of 5 live tickets are past a date somebody committed to.
1 of 7 tickets are still held on a device. The console has the device's copy, not a confirmed submission.
5 of 7 tickets carry both a photo and a GPS fix. Where either is missing the record says missing — nothing is inferred.
0 of 2 closures were verified by whoever did the work. Permitted (BR-CA7), disclosed rather than hidden, and the director's to countersign.
That a section was reached is a claim about the inspector; that it was compliant is a claim about the site. Those are different facts and this console holds neither.
The device records coverage and attestation method. Inspection records do not reach the console, so it cannot be computed — and a zero here would be a lie, not a low score.
Analytics
Are we closing faster than we are raising?
DerivedNet per day, above and below the line. Warm above means more came in than went out. Deliberately not green-versus-red: those two measure almost identically to a red-green colourblind reader, which would make the most important chart here unreadable to roughly one man in twelve.
No. Across all 10 days the backlog never once shrank — 5 days grew it and the rest held level.
Show the numbers
| Day | Raised | Closed | Net |
|---|---|---|---|
| 09/07 | 1 | 0 | +1 |
| 10/07 | 0 | 0 | 0 |
| 11/07 | 0 | 0 | 0 |
| 12/07 | 0 | 0 | 0 |
| 13/07 | 1 | 0 | +1 |
| 14/07 | 1 | 1 | 0 |
| 15/07 | 2 | 1 | +1 |
| 16/07 | 0 | 0 | 0 |
| 17/07 | 1 | 0 | +1 |
| 18/07 | 1 | 0 | +1 |
Where it concentrates
DerivedOne hue, because this is a magnitude question. Colouring each bar by category would spend the only free channel restating the bar length.
How long things sit
DerivedAgeing is the analytic this dataset genuinely supports. It is also the one that predicts a bad quarter earliest.
Oldest live: NCR-2026-029 at 5 days — Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.
Live tickets outstanding
A running sum of the same net flow — the backlog, day by day.
The rest of the exposure
The analytics that would matter most
Not capturedCoverage over time, attestation-method mix, audit findings by grade, and incidents against their regulatory clock. Those four would tell you whether the system of control works, which is the only question a board actually asks.
Blocked on: inspection records do not reach the console; audits and incidents do not exist as processes
The queue — 3 decisions
DerivedNot a feed. Each row is a decision only you can make, and acting on it makes the list shorter.
North fuel point spill kit short of manifest — absorbent booms absent.
Verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.. The first fix did not hold.
If you act: A new corrective action is appended. The failed one stays on the record.
How do you know that's true?— show the evidence
- Jul 15M. Michaud — Raised medium — North fuel point spill kit short of manifest — absorbent booms absent.
- Jul 15HSE lead — Assigned, due Jul 18.
- Jul 16HSE lead — Interim booms staged from central store; supplier reorder placed, ETA Jul 17.
- Jul 17M. Michaud — Verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.
Mixed construction waste in the clean-fill bin at the south laydown.
Nobody owns this and no date is committed, so it cannot be reported as overdue against anything.
If you act: The ticket becomes measurable and lands on somebody's queue.
How do you know that's true?— show the evidence
- Jul 18D. Tremblay — Raised low — Mixed construction waste in the clean-fill bin at the south laydown.
Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.
Verified effective by M. Michaud. The closure is the assertion that the work happened.
If you act: It closes as corrected, naming you and the grounds.
How do you know that's true?— show the evidence
“Dust off the haul road at the boundary, water truck is down.”
- Jul 13M. Michaud — Raised medium — Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.
- Jul 13Site super — Assigned, due Jul 15.
- Jul 14Site super — Backup water truck brought on shift; haul road watered on a 2-hour cycle.
- Jul 15M. Michaud — Verified effective — Boundary walked at 14:10 — no visible dust plume; suppression cycle observed.
Intent: Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS). Every score, chart and count above derives from the 7tickets in the register — no figure is restated by hand, and the one component with no data reads “no data” rather than zero. Dates measure against 2026-07-18, a prerender anchor rather than a clock. The old roll-up leads with six weeks of hardcoded scores; this page has none.