Cogneris
Environmental Compliance & Inspection

Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).

Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.

Clarke Gunter · Environmental Director

“Where is my exposure, across every project and every phase?”

This surface: The roll-up — the shape of the programme rather than any one ticket.

Band · manager
Cadence · Daily
Employee
What the record ties to this person

Nothing. The record carries no string for Clarke Gunter at all, so no row on any surface can be attributed to them. That is the identity gap (S1) rather than an empty queue — and it is why this band prints the fact instead of a zero.

May sign · may not

Close a verified NCR (+8 more) · Raise a finding in the field (+2 more). Printed, not enforced: nothing in this console checks a permission.

Module · Reporting Dashboard

Program roll-up

The view the program manager and client see. New issues against issues closed, week over week — plus where the findings concentrate — so the trend is legible without opening a single inspection.

Issues this period
24
6 weeks
Closed
21
88% close rate
Avg. days open
4.2
target ≤ 5
Repeat findings
3
same area 2+ wks

Weekly performance

This reporting week
78Watch
Inspection coverage92
On-time closure71
Repeat findings held64
Evidence attached85

Compliance health

Obligation register
84On track
Areas passing75
Obligations met89
Cleared before due68
Authority coverage96

Score by site

≥ 80 60–79< 60
82
Woodbine UTS
74
Danforth GO
57
Scarborough Jct
88
Lakeshore East
63
Guildwood

New vs. closed issues

New Closed
W23
W24
W25
W26
W27
W28

Findings by category

Erosion & sediment34%
Spills & containment21%
Equipment tags18%
Waste & manifests15%
Air & dust12%

NCR submissions

Open the register →

Non-conformances raised in the field app this period. A ticket is its own record with its own lifecycle, so these are counted apart from the obligation register — an NCR traces to an obligation, it is not one.

Raised
17
this period
Live
17
17 unassigned · 0 in correction
Overdue
0
past the committed date
Awaiting signature
0
verified, not yet closed

Tickets by area

waste7 · 7 live
spill4 · 4 live
air3 · 3 live
erosion3 · 3 live

How the closed ones closed

Corrected & verified
a verification found the fix effective
0
Retracted — not a non-conformance
raised in good faith, no correction claimed
0
Superseded by another ticket
the trail continues on the ticket named
0
Needed more than one fix
first correction did not hold — repeat work
0
Verified by the person who fixed it
no second party checked the work
0

17 tickets delivered by a device.

Vision-origin findings

2 of 5 this period

Findings the inspector confirmed from a camera suggestion. The tag is for manager calibration only — these score identically to typed or spoken findings and carry no extra weight.

OBL-118 · Equipment inspection tagsVision-origin
OBL-072 · Spill kits & containmentVision-origin

Illustrative data. In production these tiles read from the same obligation register and inspection stream the field crew writes to. The NCR figures are derived from the submissions on /compliance — no number here is restated by hand.

The surface above is the same for every role. `?role=` states who is looking and shapes what is emphasised; it filters nothing and withholds nothing, because there is no identity service, no session and no permission check in this console. A role banner over an unfiltered page is only honest while it says so.