Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
Demos & decks
Everything clickable, in one place — what is running now, and every mock and deck that led to it. Each is labelled current, superseded or reference.
Running now
Mockups & prototypes
The handset flow, screen by screen, without a device.
The pinned client report format the inspection must reproduce (BR-S5).
Presentations
The first cut of the value-proposition deck.
The original walkthrough: one incident followed end to end.
Current deck. Defines the product as four components and the portal as governed execution.
Current walkthrough. Step 4 is the manager workflow the portal is specified from.