Conceptual model
The eight work objects, their lifecycles, and the WHERE/WHAT bindings
ESG/01_conceptual_model.svg
Process map
How all four processes feed the NCR ticket
ESG/02_process_map.svg
NCR lifecycle
The one implemented lifecycle, transition by transition
ESG/03_ncr_lifecycle.svg
Inspection walk
The inspection, section by section
ESG/04_inspection_walk.svg
Audit walk
The audit that does not exist yet, and what it would need
ESG/05_audit_walk.svg
Incident to investigation
Incident, investigation and report — all three absent
ESG/06_incident_investigation.svg
Architecture
Workers, device and console — and the delivery boundary
ESG/07_architecture.svg
Framework layers
The layered stack
ESG/08_framework_layers.svg
Event flow
One inspection, capture to console, step by step
ESG/09_event_flow.svg
App information architecture
The field app: two destinations and a microphone
ESG/10_app_information_architecture.svg
Rita
What the agent is, and what she refuses to be
ESG/11_rita.svg
Process coverage
Every process family, and where each one stops today
ESG/12_process_coverage.svg
Assets, locations and the site map
Geotagging, the asset register, and the site map as the console home
ESG/13_assets_locations_and_the_site_map.svg
Eglinton Crosstown — corridor
A linear site as chainage, watersheds, and obligations that change as you walk
ESG/14_eglinton_crosstown_environmental_map.svg
Ontario Line — brownfield
River, excess soil and buried history
ESG/15_ontario_line_environmental_map.svg
Ontario Line — street overlay
Superseded by 17; kept to show why a hand-drawn grid fails
ESG/16_ontario_line_street_overlay.svg
Ontario Line — OSM overlay
The zones over real OpenStreetMap geometry, Web Mercator
ESG/17_ontario_line_osm_overlay.svg
One register, three drawings
Planimetric, schematic and tabular views of the same records
ESG/18_one_register_three_drawings.svg
Modes, levels and drilldown
How the spatial views move between portfolio, site and asset
ESG/19_modes_levels_and_drilldown.svg
Eglinton Crosstown — OSM overlay
Line 5 over real geometry
ESG/20_eglinton_crosstown_osm_overlay.svg
Ontario Line — OSM overlay (revised)
The corridor, roads, rail and the Don
ESG/21_ontario_line_osm_overlay.svg
How far each action gets
Every capture action and where it stops — completeness inside one company, not a trust boundary
ESG/20_how_far_each_action_gets.svg
NCR delivery
Completing an NCR is the save — and what may honestly be claimed about delivery
ESG/21_ncr_delivery.svg
Frontier-model boundary
The only control boundary: on-device, company cloud, external inference — and what may cross
ESG/22_frontier_model_boundary.svg
Roles — the org chart
Four bands, three axes: who the fourteen actors are, and why a band is authority over the record rather than seniority
ESG/30_roles_org_chart.svg
Role flow — environmental director
Portfolio-wide: glance → spotlight → decide → release → answer for it, and the RD-1 claim that blocks it
ESG/31_role_flow_director.svg
Role flow — environmental manager
One project: arrivals → triage → verify → hand up. Retraction is deliberately not theirs
ESG/32_role_flow_manager.svg
Role flow — site supervisor
The narrowest surface: only what is assigned, recorded with the date the work was actually done
ESG/33_role_flow_supervisor.svg
Role flow — field inspector
Walk → attest → capture → sign → did it arrive. Coverage is a claim about the inspector, not the site
ESG/34_role_flow_inspector.svg
Role flow — auditor (internal / external)
Scope → walk → grade → raise → conclude. Major and minor must raise a ticket; observation and OFI must not
ESG/35_role_flow_auditor.svg
Role flow — client representative
Released records only — and release is not a state this system has yet
ESG/36_role_flow_client.svg
ESG lifecycle — end to end
Five phases, the gate each one ends with, the obligation register that runs through all of them, and the project state machine
ESG/37_esg_lifecycle.svg
Environment inside an infrastructure programme
Five lanes x five phases: where the environmental thread sits, what it issues to the rest, and why it is not a downstream function
ESG/38_environment_in_the_programme.svg
The capital lifecycle, end to end
Seven phases, not five — phase 0 (need, funding, procurement) and phase 6 (in service) belong to the owner, and the obligations that bind hardest are created and consumed there
ESG/39_capital_lifecycle_end_to_end.svg
Five disciplines, one name
Sheet 37 is ESG, GRC, H&S, project quality assurance and project delivery specified once under the name of one of them — and what each still needs
ESG/40_five_disciplines_one_sheet.svg
The register spine — one object, nine origins
Obligation, requirement, commitment, covenant and performance standard as one object type: origins, states, artifact classes, and the residual set nobody can list
ESG/41_register_spine_one_object.svg
The assurance overlay
The V with the rail taken out: eleven processes, the artifact ladder, and the demonstration of fitness for service assembled from the register rather than written at the end
ESG/42_assurance_overlay.svg
Phase 0 — how a promise becomes a contract
Capital plan, funding, financing and bond management, procurement and delivery model — and what each one issues into the register
ESG/43_owner_side_money_and_procurement.svg
The public commitment
Consultation, input, and the disposition rule that stops a promise made in a room from lapsing silently — plus the privacy gap this does not fill
ESG/44_public_input_and_commitment.svg
Coverage — built, specified, absent
Seventeen object families across seven phases, in three states, assembled from documents rather than a code audit
ESG/45_coverage_grid.svg
The same method, four asset classes
Rail, pipelines, mining and oil & gas — what changes is vocabulary, regulator and the name of the fitness demonstration, never the object model
ESG/46_verticals_beyond_rail.svg