News & activity: the decision that unblocks ingestion

What this is. The console's News & Activity surface separates four origins — Internal · External · Vendor · Partner — because they differ in who can be held to them. Of the 24 items it shows, 11 are derived from registers the console actually holds and 13 are briefed: authored sentences, written for the console, dated against the demo anchor. There is no feed reader, no regulator subscription, no vendor portal and no partner channel anywhere in this system.

The code is ready for real items; nothing can be built until somebody decides what to connect. That decision is four small ones, one per origin, and each can be taken independently. This page is here so the decision can be taken in ten minutes rather than becoming a project.

Written by Claude Opus 5 (Claude Code), 2026-08-08. Where it lands: app/lib/signals.ts — Signal, SignalSource, and the basis: "derived" | "briefed" split that every row already wears on its face.


The rule any source must satisfy

A fetched item must be as attributable as a derived one. Every signal in the model carries from, at, basis, the lane it lands in, soWhat, and refs into the real registers. unresolvedRefs() already fails loudly when a reference does not resolve. Any real feed has to fill those fields, or it will produce rows that look like the derived ones and cannot be traced like them — which is the exact failure the basis tag exists to prevent.

A third basis value ("fetched") should be added when the first real source lands. "Derived" means this console computed it; a fetched item is neither that nor authored, and collapsing it into either would be a lie of convenience.


1 · Internal — the cheapest, and already half done

Today: 11 derived items (tickets raised/closed/ineffective, permits expiring) plus 2 briefed ones.

Options

OptionWhat it takesWhat it buys
A. Extend the derivation (recommended)Code only, no integrationStage observations, evidence arrivals and sign-offs become activity rows the moment those events reach the console
B. Connect Teams/emailAn app registration, a mailbox, a retention positionHuman chatter, most of which is not a record and should not be presented beside one

Recommendation: A. Everything the console already receives should appear here before anything external is connected. The gap between "the console holds this" and "the activity feed shows it" is pure code.

2 · External — regulators and authorities

Candidates: MECP (ECA/PTTW bulletins) · TRCA (permit and watercourse advisories) · Ministry of Labour (inspection blitzes) · Environment Canada (rainfall crossing the 25mm permit threshold).

The honest position on each: none publishes a machine-readable feed keyed to our permits. They publish pages and bulletins. So the realistic options are:

OptionWhat it takesRisk
A. Weather only, first (recommended)One public API, keyed to site coordinatesLow. It is numeric, attributable, and already drives a permit condition (OBL-091 exists because of a rain event)
B. Bulletin scrapingA scraper per authority, and a maintainerHigh. Silent breakage produces an empty feed that reads as "nothing happened"
C. A paid regulatory-intelligence serviceBudget + procurementMedium. Attribution is good; relevance filtering is somebody else's judgement

Recommendation: A now, C evaluated, B never without an owner. A scraper with no maintainer is worse than a briefed item, because a briefed item admits what it is.

3 · Vendor — suppliers and their commitments

Today: 3 briefed (booms lead time, plant re-inspection slot, calibration expiry). Each ties to a real ticket or permit.

The question: do suppliers confirm dates in writing anywhere the console could read? Usually a PO system or an email. Recommendation: a manual entry form on the console with a mandatory refs field, marked basis: "entered", is worth more than an integration — it costs a day, and it makes a supplier commitment part of the record the moment somebody hears it.

4 · Partner — client, JV and subcontractors

Today: 4 briefed (possession cancelled, template adoption, haul-route restriction, assurance-pack date).

The question is governance, not technology. A partner item is a position we influence rather than direct, and publishing one inside our compliance record has contractual weight. Recommendation: manual entry with attribution to the person who received it, until there is an agreed channel. Do not connect a partner system before the contract says what may be recorded from it.


What to decide

  1. Internal: extend the derivation to every event the console already holds. Yes / no.
  2. External: connect a weather source keyed to site coordinates. Yes / no.
  3. Vendor + Partner: build one manual-entry form with mandatory references and a third basis value. Yes / no.
  4. Anything else stays briefed, and keeps saying so.

Nothing here is blocked on engineering. Until a decision is taken, the feed continues to state on its face that 13 of its 24 items were authored and none were fetched — which is honest, and is also the reason it cannot yet be used to run anything.