Business Requirements — the whole ESG project lifecycle
Status: draft for review. Date: 2026-08-04. Revision A. Written by Claude Opus 5 (Claude Code) at Pete's request: build out the BRD for every state and every phase of ESG.
This document does not replace BRD-field-processes.md. That document is the business case for the four field processes, and it remains authoritative for them. It covers one cell of an eight-cell grid. This document covers the other seven: the three phases that happen before a site is ever walked, the closeout that happens after, and the rules that bind all of them into one project.
Identifier families here are new and additive — BR-LC, BR-REG, BR-BID,
BR-CST, BR-MOB, BR-CLO, BR-ST. Nothing in the existing BR-CA, BR-S,
BR-AU, BR-I, BR-X, BR-U families is renumbered.
Read with FRD-lifecycle-all-phases.md (the functional half), PORTAL-ROLES.md (who may act) and PERSONA-environmental-director.md (who this is for).
1. Purpose and scope
1.1 What was missing
The requirement set as it stands describes a system that begins the day a site is first walked. It has no representation of how the work was won, what it was priced at, what was promised in order to win it, or whether the site was ever fit to be operated. It also has no representation of what survives handover.
Two consequences, and both are commercial rather than technical:
- The promise and the record cannot be reconciled. An environmental commitment made to win a contract is the same obligation that is later inspected against. If those live in different systems, nobody can answer "you bid this on the basis of X — did you do X?", which is the question asked in every claim, every review and every renewal.
- Past performance cannot price future work. The register accumulates exactly the data that would let a bid be priced from evidence rather than optimism, and no path exists to use it.
1.2 The eight-cell grid
Four processes across four operating phases. The shaded cell is the only one specified today.
| Bidding | Costing & planning | Onboarding | Managing | |
|---|---|---|---|---|
| NCR | history prices the bid | remediation contingency | template + owners | specified |
| Inspection | cadence → labour | cadence × duration | template + inspector | specified |
| Investigation | incident history = risk premium | response capacity | escalation path | partly specified |
| Audit | certification commitments | programme cost | standard + schedule | specified, unbuilt |
1.3 Scope of this revision
In scope. Phases 1, 2, 3 and 5; the project lifecycle state model; the obligation register as the spine across phases; the states of every aggregate.
Out of scope. The four field processes themselves (see the field BRD); the identity and authority model (see PORTAL-ROLES); commercial contract management beyond its environmental scope; anything that is not an environmental, sustainability or governance obligation.
2. Current state, stated honestly
No phase other than managing exists in any layer.
| Evidence | Finding |
|---|---|
packages/esg-projects/src/index.ts | The canonical Project is id · name · client · contractRef. There is no lifecycle state. A project comes into existence already being inspected |
app/lib/projects.ts | Carries a phase field, but it holds prose — "Corridor · tunnel and surface", "Weekly inspection" — a description of the work, not a state anything can branch on |
| Repository-wide search | Bid, tender, budget, costing, estimate, procurement, mobilisation and onboarding vocabulary returns one incidental hit |
app/lib/obligations.ts, app/lib/permits.ts | Registers exist and carry real derivation, but nothing binds an obligation to a project — applicability is absent |
docs/ | A TSD is cited as authority by packages/esg-events-obligation (TSD 2.1, 2.1.1, 4.3) and by PORTAL-ROLES (TSD 2.4), and does not exist in this repository |
Phases 1–3 are therefore not thin. They are absent, and this document specifies them from zero rather than describing something partly built.
3. Business objectives
Extending BO-1..BO-9 in the field BRD.
| ID | Objective | Measure of success |
|---|---|---|
| BO-10 | A project has a lifecycle, and every record knows which phase produced it | Any obligation, cost line or ticket can be traced to the phase it originated in |
| BO-11 | What was promised to win the work is what is inspected against | Every obligation on a live site traces to a bid commitment, a permit condition, or a stated later addition — with no orphans |
| BO-12 | A bid is priced from what comparable work actually cost, not from estimate | Bid packs cite measured history: NCRs per inspection, days-to-close, environmental delay |
| BO-13 | The environmental scope gates the programme as well as costing it | Permit lead times and environmental windows are issued as dated constraints before the schedule is baselined |
| BO-14 | A site does not begin producing records until somebody accepted it was fit to | Every operating site carries a mobilisation sign-off naming a person and a date |
| BO-15 | Obligations that outlive construction survive handover | No monitoring or restoration obligation is lost at practical completion |
| BO-16 | Every aggregate has an explicit, closed set of states | No record is ever in an undefined or inferred state |
BO-11 is the commercial heart of this document. The rest are supporting.
4. Stakeholders by phase
The field BRD's stakeholder table holds for phase 4. Phases 1–3 and 5 add parties who never appear on a site.
| Phase | Who decides | Who is consulted | Who is accountable |
|---|---|---|---|
| 1 · Bidding | Bid/commercial lead | Environmental director, planner, estimator | Environmental director for the environmental conditions attached |
| 2 · Costing & planning | Commercial lead + planner | Environmental director, specialist subconsultants | Environmental director for the budget and the dated constraints |
| 3 · Onboarding | Project manager | Environmental manager, inspector, IT/platform admin | Environmental director for the mobilisation sign-off |
| 4 · Managing | Environmental manager | Inspector, supervisor, HSE lead | Environmental director |
| 5 · Closeout | Project manager | Environmental director, regulator, client | Environmental director for surviving obligations |
5. The lifecycle
5.1 The phases, and what each ends with
| Phase | The question | Ends with |
|---|---|---|
| 1 · Bidding | What would this bind us to, and can we carry it? | Go / no-go, with environmental conditions attached |
| 2 · Costing & planning | What does the environmental scope cost, and what does it gate? | A signed environmental budget + a list of dated constraints issued to the planner |
| 3 · Onboarding | Is this site actually fit to be operated? | Mobilisation sign-off — this site may now produce records |
| 4 · Managing | Is the record defensible, and is anything about to hurt me? | A defensible record and a pack that survives challenge |
| 5 · Closeout | What survives us leaving? | A handover register of obligations that outlive the works |
5.2 Cross-phase rules
| ID | Business rule |
|---|---|
| BR-LC-1 | A project has exactly one lifecycle state at any time, drawn from a closed set, and the state is a recorded fact rather than a derived guess |
| BR-LC-2 | Phase transitions are decisions, not schedule events. Each is an appended record naming the person, the date and the grounds |
| BR-LC-3 | A phase transition may be refused, and the refusal is recorded with its reason. A project that cannot mobilise must be visible as such |
| BR-LC-4 | Phases may be re-entered. A live project that wins a variation re-enters costing for that scope; re-entry never rewrites the prior phase's record |
| BR-LC-5 | A lost bid is a terminal state that is retained, not a deleted record. What we bid and did not win is the comparison set that prices the next bid |
| BR-LC-6 | Records created in one phase remain attributable to it forever. An obligation added at mobilisation must not be indistinguishable from one promised at bid |
| BR-LC-7 | No phase may be skipped silently. Operating a site with no mobilisation sign-off is permitted only as a recorded exception naming who accepted the risk |
5.3 The register is the spine
| ID | Business rule |
|---|---|
| BR-REG-1 | An obligation is one object across the whole lifecycle. Identified at bid, priced at costing, applied at mobilisation, inspected at managing, and handed over or discharged at closeout — the same record throughout |
| BR-REG-2 | Every obligation carries its origin: bid commitment · permit condition · statutory requirement · client instruction · internally raised. Origin is never inferred |
| BR-REG-3 | An obligation must be applicable to a project to bind it. A register with no applicability model binds nothing and everything, which is the same as binding nothing |
| BR-REG-4 | An obligation promised at bid and not carried forward into the live project must be reportable as such. Silent disappearance is the failure BO-11 exists to prevent |
| BR-REG-5 | An obligation library may be reused across bids; a project's obligations are instances of library entries, not copies that drift |
| BR-REG-6 | Where an obligation is varied after award, the variation is appended with its authority. The original text remains readable |
6. Phase 1 — Bidding
6.1 What the phase is for
To answer, before commitment: what would this contract oblige us to do, what would that cost, can we resource it, and what conditions must be attached to any bid we submit.
6.2 Business rules
| ID | Business rule |
|---|---|
| BR-BID-1 | A bid carries an environmental scope: the obligations, permits, approvals and monitoring programmes the contract would create |
| BR-BID-2 | The environmental scope is drawn from a library, not re-read from the specification by whoever is free that week |
| BR-BID-3 | A bid must state its environmental risk premium — the receptors, sensitivities, windows and ground conditions that make this site dearer than its area suggests |
| BR-BID-4 | A bid must be checked against inspector capacity already committed across the live portfolio. Winning work we cannot staff is a compliance failure with a lead time |
| BR-BID-5 | A bid must cite comparable measured history where comparable projects exist: NCRs per inspection, median days to close, regulator attention, environmental delay. Where none exists the bid says so rather than estimating silently |
| BR-BID-6 | The environmental director records a go / no-go with conditions. Conditions attach to the bid and survive into the project if it is won |
| BR-BID-7 | A bid is retained whether won or lost, with its outcome, because the comparison set is the asset (BR-LC-5) |
| BR-BID-8 | Bid material is commercially confidential and its visibility is narrower than the operating record's |
6.3 Why this is worth building
The register accumulates the only dataset that can price environmental risk from evidence. A competitor without records must estimate. This is the phase where the discipline of every other phase is converted into commercial advantage, and it is the phase most likely to be dismissed as "not compliance".
7. Phase 2 — Costing, budgeting and planning
7.1 Two outputs, routinely conflated
The environmental scope does not only cost money; it gates the programme. Treating it as a cost line alone is the single most expensive mistake in this phase, because a missed environmental window is not recoverable with money.
7.2 Business rules — the cost line
| ID | Business rule |
|---|---|
| BR-CST-1 | The environmental budget is composed of stated lines: inspection labour (cadence × duration × sites), monitoring programmes and equipment, specialist subconsultants, permit fees, and remediation contingency |
| BR-CST-2 | Remediation contingency is priced from measured history where it exists (BR-BID-5), and the basis is recorded either way |
| BR-CST-3 | The environmental budget is signed by the environmental director. An unsigned budget is a proposal, and the project must be able to report that it is operating against one |
| BR-CST-4 | Budget consumed is reportable against budget signed, per project and per portfolio |
7.3 Business rules — the constraints
| ID | Business rule |
|---|---|
| BR-CST-5 | Permit lead times are schedule constraints, not compliance items to be tracked once work starts. A permit that takes 90 days to issue constrains the construction sequence |
| BR-CST-6 | Environmental windows — in-water timing, migratory bird nesting, fish spawning, species-at-risk restrictions — are recorded as dated constraints with their authority |
| BR-CST-7 | Constraints are issued to the planner as a dated list before the schedule is baselined, and the issue is a recorded event |
| BR-CST-8 | Baseline monitoring that must run before works commence is identified in this phase, because after commencement it cannot be obtained at any price |
| BR-CST-9 | A constraint that is breached or waived must be recorded with the authority that permitted it. A window missed silently is the most expensive record in this system |
8. Phase 3 — Onboarding and mobilisation
8.1 What the phase is for
To turn a won contract into a site that can produce defensible records. Its output is a readiness gate, and the gate is the point: a site producing records before it was fit to produce them produces bad ones, and nobody knows which ones.
8.2 Business rules
| ID | Business rule |
|---|---|
| BR-MOB-1 | A project must declare its kind — corridor · building · area site — because the kind decides which spatial model applies |
| BR-MOB-2 | A project must carry a boundary and its control areas, each with a category. Without them a finding cannot say where |
| BR-MOB-3 | A project must carry an asset register — the things with histories — or state that it has none |
| BR-MOB-4 | Applicability must be established: which obligations and permits bind this project (BR-REG-3), and obligations carried from the bid must be reconciled (BR-REG-4) |
| BR-MOB-5 | Permits must be recorded as in hand or applied for, and a site must not mobilise against an unissued permit without a recorded exception |
| BR-MOB-6 | An inspection template and a cadence must be assigned |
| BR-MOB-7 | A named inspector with a working device must be assigned. An actor string is not a person (see PORTAL-ROLES §3.2) |
| BR-MOB-8 | Baseline condition must be captured, or its absence recorded with the reason |
| BR-MOB-9 | Team and roles must be assigned, including who may sign off |
| BR-MOB-10 | The environmental director records a mobilisation sign-off: this site may now be operated. Every item above is either satisfied or explicitly waived, and a waiver names who accepted it |
| BR-MOB-11 | Mobilisation readiness is reportable while incomplete — the value is knowing what is outstanding, not only that the gate has passed |
9. Phase 4 — Managing
Specified in BRD-field-processes.md §5, which remains authoritative. Two additions from the lifecycle view:
| ID | Business rule |
|---|---|
| BR-LC-8 | The operating record must be able to state, for any obligation, which phase it originated in and whether it was promised, permitted or later added (BR-REG-2) |
| BR-LC-9 | Dated constraints issued in phase 2 remain live through phase 4 and are reportable as forthcoming, met, or breached (BR-CST-9) |
10. Phase 5 — Closeout and what survives
10.1 The problem
Environmental obligations routinely outlive the works: restoration monitoring for several seasons, warranty periods, records retention against a limitation period, and reporting that continues after demobilisation. Whether this is a fifth phase or the tail of the fourth was logged as open decision CG-6; this document treats it as a phase because it has a different owner, a different cadence and a different reader.
10.2 Business rules
| ID | Business rule |
|---|---|
| BR-CLO-1 | At practical completion every obligation must be discharged, transferred or carried forward — and each of the three is an explicit decision, not an expiry |
| BR-CLO-2 | Obligations carried forward form a handover register with a named owner beyond the project team |
| BR-CLO-3 | Monitoring that continues after demobilisation must retain a cadence, an owner and a reporting route |
| BR-CLO-4 | The records retention period is recorded per project against the applicable limitation period, and records are not disposable before it |
| BR-CLO-5 | A closeout report states what was promised, what was done, what was found and what survives — the phase-1 promise reconciled against the phase-4 record (BO-11) |
| BR-CLO-6 | A project in closeout is read-only for capture but must remain fully readable, because a challenge arrives after the team has gone |
11. The state model
Every aggregate has a closed set of states (BO-16). Full transitions and guards are specified in FRD-lifecycle-all-phases.md §3; this is the business view.
| Aggregate | States | Terminal |
|---|---|---|
| Project | prospect → bidding → bid-submitted → won / lost → planning → mobilising → operating → closing → closed | lost, closed |
| Bid | drafting → scoped → conditioned → submitted → won / lost / withdrawn | won, lost, withdrawn |
| Environmental budget | draft → proposed → signed → superseded | superseded |
| Constraint | identified → issued → active → met / breached / waived | met, breached, waived |
| Mobilisation gate | open → items-outstanding → signed / waived-in-part / refused | signed, refused |
| Obligation | identified → applicable → active → met / overdue → discharged / transferred / carried-forward | discharged, transferred |
| Permit | required → applied → issued → active → expiring → expired / renewed / surrendered | expired, surrendered |
| NCR | open → assigned → actioned → verified → closed (reopenable) | closed |
| Inspection | scheduled → in-progress → signed → delivered | delivered |
| Audit | scheduled → in-progress → findings-graded → concluded | concluded |
| Incident | reported → investigating → contained → closed → verified | verified |
| Investigation | opened → evidence-gathered → cause-determined → actions-raised → concluded | concluded |
| ID | Business rule |
|---|---|
| BR-ST-1 | Every aggregate is in exactly one state from its closed set. There is no null, no unknown and no inferred state |
| BR-ST-2 | Every transition is an appended event naming actor, time and grounds. States are never edited in place |
| BR-ST-3 | A transition that a rule forbids must be refused with a stated reason, never silently ignored |
| BR-ST-4 | Terminal states are reachable only by a decision, never by the passage of time. An obligation does not become discharged because its date passed |
| BR-ST-5 | Where a state is derived for display (e.g. overdue, expiring), the derivation is stated and the underlying facts remain visible |
12. Assumptions
| ID | Assumption | If wrong |
|---|---|---|
| AS-10 | One project may re-enter costing for a variation without a new project record | Variations need their own aggregate |
| AS-11 | The obligation library is shared across bids within a tenant | Per-project authoring; BR-REG-5 changes |
| AS-12 | Bid data is visible to a narrower audience than operating data | The role model needs a commercial band |
| AS-13 | Closeout obligations remain in this system rather than transferring to an asset-management system | An export contract is required |
13. Dependencies
| ID | Dependency | Owner |
|---|---|---|
| DP-10 | A decision on Project lifecycle state — widened aggregate, or a separate pre-award aggregate (CG-7) | Architecture |
| DP-11 | The signed claim carries project singular (RD-1), so no portfolio-scoped phase view is expressible | Architecture |
| DP-12 | A store the console can write to — every phase output here is a write | Operations |
| DP-13 | Identity and authority (S1/S2) — every phase gate is a signature | Operations |
| DP-14 | The TSD, which is cited by code and absent from the repository | Whoever holds it |
| DP-15 | The applicable environmental windows and lead times for the operating region | Environmental director |
14. Out of scope
Commercial bid pricing beyond environmental lines; procurement and subcontracting; general project scheduling; asset management after handover; health and safety except where an incident is both; carbon and sustainability reporting unless it is an obligation on the register.
15. Open decisions
| ID | Question | Owner |
|---|---|---|
| CG-6 | Is post-construction monitoring a fifth phase or the tail of the fourth? (this document assumes a phase) | Director / commercial |
| CG-7 | Does Project gain lifecycle state, or do phases 1–3 live in a separate pre-award aggregate? | Architecture |
| CG-8 | Is the obligation library shared across bids or authored per project? | Director / architecture |
| LC-1 | Does a lost bid retain its full environmental scope, or only its summary? | Commercial |
| LC-2 | Who owns a carried-forward obligation once the project team demobilises? | Director / operations |
| LC-3 | May a site operate against an applied-for-but-unissued permit, and who accepts that risk? | Director / legal |
| LC-4 | Is the environmental budget a control (work stops) or a measure (variance reported)? | Commercial |
16. Traceability
| Objective | Rules |
|---|---|
| BO-10 lifecycle | BR-LC-1..7, BR-ST-1..5 |
| BO-11 promise = record | BR-REG-1..6, BR-BID-6, BR-MOB-4, BR-CLO-5 |
| BO-12 priced from history | BR-BID-5, BR-CST-2, BR-LC-5 |
| BO-13 scope gates programme | BR-CST-5..9 |
| BO-14 fit to operate | BR-MOB-1..11 |
| BO-15 survives handover | BR-CLO-1..6 |
| BO-16 explicit states | BR-ST-1..5, §11 |