Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).
Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.
Marie Boucher
Environmental Manager · ONxpress CJV · Woodbine (UTS)
“Is my site defensible, and what is waiting on me to verify?”
- — Assign an owner and a due date
- — Record that corrective work was verified effective
- — Accept a section recorded as not reached
- — Approve a retraction — that is the director's
- — Countersign their own verification
- — Release a report to the client
ONxpress CJV · Woodbine (UTS)
7 of 7 tickets in the register are on this siteEverything below is scoped to this project. A manager who can see the whole portfolio spends their day reading other people's problems.
What is waiting on you — 2
DerivedAssigning an owner and recording that work was verified effective are yours. Approving a retraction and countersigning a self-verified closure are not — those are the director's, and the split is the point rather than an inconvenience.
North fuel point spill kit short of manifest — absorbent booms absent.
The correction was verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.. The first fix did not hold.
If you act: A new corrective action is appended; the failed one stays on the record.
How do you know that's true?— show the evidence
- Jul 15M. Michaud — Raised medium — North fuel point spill kit short of manifest — absorbent booms absent.
- Jul 15HSE lead — Assigned, due Jul 18.
- Jul 16HSE lead — Interim booms staged from central store; supplier reorder placed, ETA Jul 17.
- Jul 17M. Michaud — Verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.
Mixed construction waste in the clean-fill bin at the south laydown.
Nobody owns this and no date is committed. Until both exist it cannot be reported as overdue against anything.
If you act: The ticket becomes measurable and lands on somebody's queue.
How do you know that's true?— show the evidence
- Jul 18D. Tremblay — Raised low — Mixed construction waste in the clean-fill bin at the south laydown.
Where it concentrates
DerivedCoverage versus conformity
Not capturedWhich sections were actually attested this period, whole-section or item-by-item, and which were simply never flagged. This is the number a manager is judged on and the one they cannot see.
Blocked on: the device records it; inspection records do not reach the console