Cogneris
Environmental Compliance & Inspection

Intent · Every environmental obligation current and evidenced — zero reportable exceedances at Woodbine (UTS).

Operating tolerance: issues closed in ≤ 5 days · no repeat findings · every permit condition met.

Console v2 · The Record — What is true, and the evidence for it
band: inspectorOne project, assigned sites.

Sam Iyer

Field inspector / environmental tech · ONxpress CJV · Woodbine (UTS)

“What am I walking today, and did what I sent arrive?”

← All roles
May sign
  • — Attest a section — whole-section or item-by-item
  • — Raise an NCR
  • — Sign an inspection at completion
May not
  • — Close a ticket they raised
  • — Verify a correction

Everything you raised has reached the office.

Each one was observed to arrive — this is not an assumption drawn from the absence of an error.

Raised by you
3
Delivered
3
arrival observed
Still on the device
0
device copy only

What you raised

Derived

What happened to it after you sent it — because a finding you never hear about again is a finding you stop raising.

NCR-2026-031 Excavator EX-220 operating with an expired monthly inspection tag.High · In correction · sent Jul 15
How do you know that's true?— show the evidence
Raised byM. MichaudOn2026-07-15Photos2GPS43.7063, -79.5947Spoken note14sOriginWeekly inspection · Jul 15Delivered2026-07-15

“EX-220, tag expired end of June, taking it out of service now.”

The chain — appended, never edited
  1. Jul 15M. Michaud — Raised high — Excavator EX-220 operating with an expired monthly inspection tag.
  2. Jul 15Site super — Assigned, due Jul 16.
  3. Jul 16Vendor — Re-inspection completed on site; new monthly tag issued and fitted.
Traces to: OBL-118 · MECP · EASR · Weekly inspection · Jul 15
NCR-2026-032 North fuel point spill kit short of manifest — absorbent booms absent.Medium · In correction · sent Jul 15
How do you know that's true?— show the evidence
Raised byM. MichaudOn2026-07-15Photos1GPS43.7061, -79.5949Spoken notetyped, not spokenOriginWeekly inspection · Jul 15Delivered2026-07-15
The chain — appended, never edited
  1. Jul 15M. Michaud — Raised medium — North fuel point spill kit short of manifest — absorbent booms absent.
  2. Jul 15HSE lead — Assigned, due Jul 18.
  3. Jul 16HSE lead — Interim booms staged from central store; supplier reorder placed, ETA Jul 17.
  4. Jul 17M. Michaud — Verified NOT effective — Interim booms present but kit still short of manifest — pads and drain cover outstanding.
Traces to: OBL-072 · MECP · Spills
NCR-2026-029 Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.Medium · Verified · sent Jul 13
How do you know that's true?— show the evidence
Raised byM. MichaudOn2026-07-13Photos2GPS43.7055, -79.5962Spoken note9sOriginWeekly inspection · Jul 13Delivered2026-07-13

“Dust off the haul road at the boundary, water truck is down.”

The chain — appended, never edited
  1. Jul 13M. Michaud — Raised medium — Water truck out of service; visible dust off the Woodbine haul road at the residential boundary.
  2. Jul 13Site super — Assigned, due Jul 15.
  3. Jul 14Site super — Backup water truck brought on shift; haul road watered on a 2-hour cycle.
  4. Jul 15M. Michaud — Verified effective — Boundary walked at 14:10 — no visible dust plume; suppression cycle observed.
Traces to: Dust & air quality · Community liaison log

What you are walking today

Not captured

The inspections due on your sites this period, and which sections you have already attested. This is the inspector's actual home screen.

Blocked on: no programme or schedule model exists, and inspection records do not reach the console

Capture is not here

Camera, voice and typing are three inputs to one capture action, and that action belongs on the handset, outdoors, in gloves. A second, worse capture flow in a desktop browser is how field tools get filled in at the truck at the end of the day, from memory.

Open the field app →

Filtered on the raiser “M. Michaud” — an actor string, not a person, which is why S1 is first on the build order. Dates measure against 2026-07-18.