Cogneris
Environmental Compliance & Inspection
Metrolinx

Ontario Line

Exhibition to Science Centre, through a century of industry. Brownfield rather than greenfield, a river that was moved, and ground that holds the first Parliament of Upper Canada — a checklist written for Eglinton would miss all three.

Action neededCorridor · brownfield and riverOpen 3Locations clean 7/10Next due Aug 6
Development progress
no walks delivered · positions are the last survey · d1
Complete 0 of 10Under way 10Not started 0

No walk has delivered progress for this project yet. The positions below are the last survey, not a field observation.

Nothing unforeseen in the delivered walks

No place has gone backwards, stalled, skipped a stage or gone repeatedly unseen across the walks delivered so far. With this few walks on record that is weak evidence, not reassurance.

Where each place has got to
LocationStageProgress along the lineSource
Exhibition shorelineBackfill
last survey
Tunnel dewateringExcavation
last survey
Downtown receptorsStructure
last survey
First ParliamentExcavation
last survey
East Harbour brownfieldStructure
last survey
Port Lands naturalisationExcavation
last survey
Don valley · TRCAEstablishment
last survey
Lakeshore East corridorStructure
last survey
Thorncliffe ParkExcavation
last survey
Flemingdon ParkEstablishment
last survey

Positions marked last survey are seeded starting data, not a field observation — no walk has reported that place yet. The bar shows position along the stage sequence, not quantity of work completed.

Exhibition to Science Centre, through a century of industry. Brownfield rather than greenfield, a river that was moved, and ground that holds the first Parliament of Upper Canada — a checklist written for Eglinton would miss all three.

View
Leveldrag to pan
Layers
143141422Exhibition shorelineTunnel dewateringDowntown receptorsFirst ParliamentEast Harbour brownfieldPort Lands naturalisationDon valley · TRCALakeshore East corridorThorncliffe ParkFlemingdon Park

Planimetric. True position, to scale, over the real streets. The line really does turn north at East Harbour and climb the Don. Station points are published locations snapped to the alignment; zones are indicative circles. Corridor level. The whole site. Control areas and their totals — individual records are aggregated into one badge each.

open NCR / incidentfinding, in correctionchecked, clearpermitasset
Everything on this site
22 of 22 records · 39 assets on the plan
What this surface is

Demo data, held in the browser. Plotting a pin does not write to a database, reach the field app, or survive a refresh.

The field app already takes a GPS fix at capture — but there is no asset register for it to point at and no plan to place it on. That gap is the thing this surface is arguing for.

  • Jul 28Settlement marker SET-1 moved 6 mm above trigger over the combined sewerFinding
  • Jul 27Excess soil left site without a Record of Site Condition referenceFinding
  • Jul 26Weekly inspection completed — 3 exceptions raisedInspection
  • Jul 26Archaeological monitor absent during a Stage 3 excavation windowFinding
  • Jul 25Turbidity curtain torn at the Port Lands river worksFinding
  • Jun 30TRCA permit for the Don valley works posted at the compoundPermit