Eglinton Crosstown (Line 5)
Ten kilometres tunnelled, nine elevated or at grade. The same walk crosses four watersheds and three authorities — the obligation that applies is a function of where you are standing.
No walk has delivered progress for this project yet. The positions below are the last survey, not a field observation.
No place has gone backwards, stalled, skipped a stage or gone repeatedly unseen across the walks delivered so far. With this few walks on record that is weak evidence, not reassurance.
| Location | Stage | Progress along the line | Source |
|---|---|---|---|
| Mount Dennis MSF | Reinstatement | last survey | |
| Black Creek & Humber | Backfill | last survey | |
| Tunnelled · Keelesdale to Laird | Structure | last survey | |
| Cedarvale · Nordheimer | Reinstatement | last survey | |
| Midtown receptors | Structure | last survey | |
| West Don valley | Excavation | last survey | |
| Taylor-Massey Creek | Excavation | last survey | |
| Golden Mile lands | Backfill | last survey | |
| Elevated / at-grade · Laird to Kennedy | Structure | last survey | |
| Kennedy portal & yards | Establishment | last survey |
Positions marked last survey are seeded starting data, not a field observation — no walk has reported that place yet. The bar shows position along the stage sequence, not quantity of work completed.
Ten kilometres tunnelled, nine elevated or at grade. The same walk crosses four watersheds and three authorities — the obligation that applies is a function of where you are standing.
Planimetric. True position, to scale, over the real streets. Roads, rail and watercourses are OpenStreetMap in Web Mercator; zone centres are read by eye onto the feature each names. Corridor level. The whole site. Control areas and their totals — individual records are aggregated into one badge each.
Demo data, held in the browser. Plotting a pin does not write to a database, reach the field app, or survive a refresh.
The field app already takes a GPS fix at capture — but there is no asset register for it to point at and no plan to place it on. That gap is the thing this surface is arguing for.
- Jul 29Dewatering discharge exceeded the ECA turbidity limit at the Black Creek outfallFinding
- Jul 29Weekly inspection completed — west rank walked, 1 exceptionInspection
- Jul 27Sediment-laden runoff reached Taylor-Massey Creek after 31 mm rainfallFinding
- Jul 25MW-07 drawdown reading missed two consecutive weeks — trend cannot be shownFinding
- Jul 24Tree protection fencing breached by plant access at Nordheimer ravineFinding
- Jul 23Stockpile STK-9 uncovered and no O. Reg. 406/19 tracking sheet on siteFinding
- Jul 02ECA for construction dewatering posted at the Mount Dennis gatePermit